Upcoming

Located on the Kamlang River this Hydro-electric power plant has a capacity of 24.9MW. The DPR that has been prepared by Lahmeyer International (India) Pvt. Ltd. is at the stage of receiving techno-economic clearance. A sovereign PPA has been signed with the Government of Arunachal Pradesh for a period of 10 years from the start of commercial production.

The Hydro-electric power plant at Gimliang situated on the Dau River has a capacity of 99MW. The Hydrology chapter of the project has been cleared by the Central Water Commission, a Government of India nodal agency. The DPR submission is planned for March 2013.

Located on the Tidding River are two Hydro-electric power plants namely Tidding I and Tidding II, which have capacities of 98MW and 68MW respectively. The geology, hydrology and other surveys for the two projects are underway.

The Hydro-electric power plant at Raigam situated on the Dalai River has a capacity of 96MW. The Hydrology chapter of the project has been cleared by the Central Water Commission, a Government of India nodal agency. The DPR submission is planned for February 2013.